derby-city.jpgClient Case Study

Client: Derby City Council
Partner: Belfour Beatty Infrastructure
Project: Street Lighting
Value: £5,000,000
Duration: 1 year

This work was carried out to upgrade Derby’s street furniture on the busy A61/A52 junction as part of the ongoing rehabilitation of the road infrastructure network. The site set-up incorporated multiple lane closures with 2 way traffic light set-ups to ensure maximum traffic flow at all periods to reduce inconvenience for the public.

BBISL was able to carry out works in a safe working environment, which allowed them to complete the works on schedule and in a safe isolated area away from the traffic and pedestrians on one of the busiest arterial routes in and around Derby.

Accolade

Keith Dye (Operations Manager) from BBISL stated: ‘Outstanding....the quality of equipment and set-ups was first class!’